Quote:
Originally Posted by Grimjaw
[You must be logged in to view images. Log in or Register.]
first, we'll need a 10U blade server / 16 blades (Each zone hosted by its own server). no less than 128gig ram. we'll also need fibre across the board, from rack all the way to the backbone, with at least a dedicated 1 GBps UPLOAD just for RED ($1000 a month)
|
whats our current upload at?